Contact Us
- Room 609, Hua Yu ShuZhi Industrial Park Office Building, No.36, Liaohe Road, Dongying, Development Zone, Shandong Province
- info@ruifeng-sd.com
- 0546-8099499
- JM Woven Screen
The JM Woven Screen has the characteristic of anti-deformation, which can guarantee reliable sand control performance even in the case of serious deformation, which is especially suitable for...
Add to Inquiry - HD Hydraulic-set Dual-String Production Packer
The Model “HD” dual-string packer is a hydraulic-set, retrievable packer that isolates the annulus from the production conduit. Setting is achieved by pressuring up the setting tubing string...
Add to Inquiry - HS Hydraulic-Set Retrievable Packer
The Model “HS” hydraulic-set retrievable packer is a high performance production packer designed for high differential pressure and temperature (15,000 psi (103.4 MPa)/400°F(204°C) in single or...
Add to Inquiry - HC Hydraulic-Set Retrievable Packer
The Model “HC” packer is a hydraulic-set, tubing-retrievable production packer designed for high-pressure application. It is installed with the completion tubing and is set by applying pressure to...
Add to Inquiry - HA Hydraulic-Set Retrievable Packer
The Model “HA” hydraulic-set retrievable packer is a high performance production packer designed for medium- to high- differential pressure in single or multiple-zone applications. It is made up...
Add to Inquiry - HR Hydraulic-Set Retrievable Packer
The Model “ HR” packer is a hydraulic-set retrievable packer for isolating the annulus from the production conduit. Packer setting is achieved by applying a predetermined tubing pressure after run...
Add to Inquiry - WA Permanent Seal Bore Packer
The Model “WA” permanent seal-bore packer is a high- performance production packer designed for single or multiple- zone completion with high differential pressure. It can be set on wireline,...
Add to Inquiry - TAML 5mutilateral Well-The Window Has Mechanical Support ...
•Ruifeng Petro tech Multiple TAML-5completion system is an important technology to creats independent systems for main wellbore and branch wellbore .This system solves critical engineering...
Add to Inquiry - Delay Toe Frac Sleeve-Sliding Sleeve Delay Opening, Highp...
•The delay toe frac sleeve is used for the first stage of staged fracturing in the pipe and staged fracturing in cementing. •With delayed opening function to meet wellbore pressure test...
Add to Inquiry - Unlimited Stage Frac Sleeve-Full ID, Fracturing Layer Number
•It is used for staged fracturing in the string and staged fracturing in cementing, and the number of fractured layers is not limited. •The ID of all sliding sleeves is the same, and there is no...
Add to Inquiry - Dissolvable Bridge Plug-Ultra-short, Large ID
•It is used for bridge plug perforation and block segmented fracturing, and the number of fracturing layers is not limited. •Automatic dissolution and pressurization without wellbore intervention.
Add to Inquiry - Hydraulic Jet Tool-High Efficiency And Stability
•Using hydraulic drive cutting blade outer tensioning,rotary cutting string.
Add to Inquiry