+0546-8099499
Delay Toe Frac Sleeve-Sliding Sleeve Delay Opening, Highpressure

Delay Toe Frac Sleeve-Sliding Sleeve Delay Opening, Highpressure

•The delay toe frac sleeve is used for the first stage of staged fracturing in the pipe and staged fracturing in cementing. •With delayed opening function to meet wellbore pressure test requirements. •Adjustable opening pressure and delay time.

Description

Applications

It is suitable for the first stage fracturing operation in multi-stage fracturing of oil and gas wells.

 

Features & Benefits

  1. Simple structure, high reliability, pressure rating 150MPa.
  2. Delay time is controlled by dissolvable materials and is insensitive to parameters such as well depth.
  3. Effectively solve the problems of excessive fluctuation range of opening pressure of conventional toe end fracturing sliding sleeve, resulting in early opening of the sliding sleeve or too high opening pressure.
  4. The sliding sleeve is designed to delay the opening mechanism to reduce the starting pressure of the rupture disc blasting, and the sliding sleeve is delayed to open after the rupture disc is blasted to meet the requirements of the wellbore medium pressure and high pressure test.

 

Technical parameters

Size

OD

(mm)

Length (mm)

ID

(mm)

Delay Time

(min)

Pressure Grade

(MPa)

Temperature Rating

(℃)

4.5"

156

1200

100

30~90

(Adjustable)

150

150

5.5"

195

1296

120

30~90

(Adjustable)

150

150

 Note: Connection thread, inner and outer diameter size can be adjusted

Hot Tags: delay toe frac sleeve-sliding sleeve delay opening, highpressure, China, suppliers, manufacturers, customized, brands, BA Hydraulic Set Permanent Packer, GL Sand Control Packer, WB packer, tubing retrievable downhole safety valve, Tubing Retrievable Safety Valve, RT Packer Retrieving Tool

You Might Also Like

Send Inquiry

(0/10)

clearall