Latest News
Contact Us
- Room 609, Hua Yu ShuZhi Industrial Park Office Building, No.36, Liaohe Road, Dongying, Development Zone, Shandong Province
- info@ruifeng-sd.com
- 0546-8099499
-
12/Jun
2019
Multi-zone Gravel Pack System-Well SCS XXX
On June 12th 2019, Ruifeng Petrotech used its multi-zone completion technology to complete the XXX well in Wenchang 13-6 oilfield and successfully commenced production, with a ...
-
11/Jun
2019
Research Prospects, National 13th Five-Year Plan Scientific Research On Key T...
Based on our drive to constantly improve, we were glad to take advantage of CNOOC Zhanjiang Branch’s initiative "13th Five-Year Plan" Scientific Research on Key Technologies of...
-
30/Mar
2019
Exhibition China International PetroleumPetrochemical TechnologyEquipment Exh...
In November, 2017, Dongying Ruifeng Petroleum Technology Co., Ltd. took part in the Abu Dhabi International Petroleum Exhibition & Conference (ADIPEC) with the latest products.
-
28/Sep
2017
Outstanding Results Seen On The First Batch Of Vortex AICD Wells
The first batch of Ruifeng Petrotech’s Vortex AICD completion tools were installed in 2 wells in Xinjiang Oilfield of SINOPEC in 1st quarter of 2015, now two years have passed, ...
-
31/Aug
2017
Challenging OHGP Jobs Done With PackSure Screen OHGP System
Ledong 22-1 gas field, operated by CNOOC in South China Sea, has 4 long horizontal wells to be completed in its shallow gas bearing layer at 500m TVD, Ruifeng Petrotech solved t...
-
30/Nov
2016
Ruifeng Petrotech Completed The Longest Horizontal OHGP Job in South China Sea
DF1-1 gas field is one of the major fields in South China Sea operated by CNOOC, due to its reservoir characteristics, horizontal/directional well with open hole section is adop...
-
30/Jun
2014
First Local OHGP System Provided in South China Sea
On Jun. 06th of 2014, Ruifeng Petrotech completed its first OHGP (Open Hole Gravel Pack) job in South China Sea and became the first China local company that provides OHGP compl...
-
31/May
2014
1st Local OTMZ Completion System Used in South China Sea
A well completion job is done in May. 2014 with Ruifeng Petrotech’s OTMZ (One Trip Multiple Zone) System, which is the first local completion tool of the category used by CNOOC ...
-
31/Jul
2014
Gravel Pack System Helps Save Rig Time Under Harsh Environment
In Jul. 2013, a 2-zone gravel pack completion job took place on a new platform in Wenchang oilfield, Ruifeng Petrotech provided completion string and pumping service for the tar...